





EVM H110 DDR4 Micro ATX Motherboard – LGA1151, M.2 NVMe
EVM H110 Micro ATX motherboard with LGA1151 socket, Intel 6th/7th Gen support, dual DDR4 slots, M.2 NVMe, 4 SATA ports, PCIe x16, USB 3.0, LAN, audio, and 3-year warranty.
Product Overview
The EVM H110 DDR4 Motherboard (EVMH110NEL) is a reliable Micro ATX motherboard designed for Intel 6th and 7th Generation processors with the LGA1151 socket. It features dual DDR4 memory slots for efficient system performance and supports M.2 NVMe storage for faster boot and data transfer speeds.
The motherboard includes 4 SATA ports for additional storage devices, a PCIe x16 slot for graphics cards, and USB 3.0 connectivity for compatible high-speed peripherals. Integrated LAN and audio provide essential connectivity for everyday desktop use.
With its compact Micro ATX form factor, the EVM H110 is suitable for home, office, upgrade, and budget gaming PC builds. It comes with a 3-year warranty for added peace of mind.
Key Features:
LGA1151 socket
Supports Intel 6th/7th Gen processors
Dual DDR4 RAM slots
M.2 NVMe storage support
4 × SATA ports
PCIe x16 expansion slot
USB 3.0 connectivity
Integrated LAN and audio
Micro ATX form factor
3-year warranty
Technical Specifications
CUSTOMER FEEDBACK & RATINGS
Real performance impressions and build assessments submitted exclusively by verified buyers.
To prevent artificial spam and fake benchmarks, reviews can only be submitted by customers who have an authenticated, completed purchase of this product at IronHawk.


















